Construction of Heating Systems for the “Yangi O‘zbekiston” Residential Area Located in the Territory of “Chinobod” MFI, Dustlik District, Jizzakh Region
The total capacity of the boiler house is 10 MW (two units of N = 4.0 MW and one unit of N = 2.0 MW).
Manufacturer: “TEPLODAR” LLC, Uzbekistan, boiler brand: “TEPLODAR”.
The boilers have an efficiency rate of 92–93%.
To ensure an uninterrupted supply of thermal energy to consumers, one 4.0 MW heating boiler is designed to operate on natural gas and reserve fuel (diesel).
The boiler house is also equip
... Read More
Heating Supply Systems to be Constructed in the Territory of “Yangibod” Makhalla, Nurafshon City, Tashkent Region, within the “New Uzbekistan” Residential Area.
The total thermal capacity of the boiler house is 25 MW, including:
• two boilers with a capacity of N = 10 MW each;
• one boiler with a capacity of N = 5.0 MW.
The equipment manufacturer is “MIMSAN ENERGY” (Turkey), and the boiler model is “MIMSAN”.
The boilers are equipped with economizers, ensuring a thermal efficiency (efficiency factor) of 95–96%.
To provide uninterrupted heating energy supply t
... Read More
Construction of Heating Supply Systems for the “Yangi O‘zbekiston” Residential Area Located in the Territories of “Islom Karimov” and “A. Qahhor” MFIs, Almalyk City, Tashkent Region
The project consists of two separate heating systems.
LK-1 (Boiler House No.1) – total capacity 5.1 MW (three units of N = 1.7 MW each).
Manufacturer: “TEXNOPARK”, Uzbekistan, boiler brand: “FERROLI”.
The boilers have an efficiency rate of 92–93%.
To ensure an uninterrupted supply of thermal energy to consumers, one 1.7 MW heating boiler is designed to operate on natural gas and reserve fuel (diesel).
... Read More